Parish Link Building Project |
|||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||
The open area between church and parish hall has become a covered link between the buildings. Its gently ramped floor enables wheelchair access into the hall. A new double door provides additional entry into the side of the hall. The covered link can also provide an additional overspill area when the hall is particularly busy |
|||||||||||||||||||||||||||||||||