Parish Link Building Project |
|||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||
![]() |
|||||||||||||||||||||||||||||||||
| Inside the hall, the kitchen/servery area has been relocated to the far end (where the stage was previously situated). Wheelchair access has been provided to the hall, along with a disabled & parent/baby toilet facility. The existing toilets have been refurbished. The double doors shown lead out to the covered link area | |||||||||||||||||||||||||||||||||